Logo

Rail Mats

Item # TEZAF-SBTDT

Crafted from non-toxic and durable flexible PVC, the Rail mat boasts a sturdy construction that ensures long-lasting performance. The thick cylindrical prongs of the spill mat provide a slip-free surface for glassware and dishware, keeping the bar and kitchen counter top organized and pristine. Versatile in its functionality, this mat can be placed next to a coffee machine pot or sink, offering a practical solution for maintaining cleanliness in various settings. 23 5/8" L x 4" W

Crafted from non-toxic and durable flexible PVC, the Rail mat boasts a sturdy construction that ensures long-lasting performance. The thick cylindrical prongs of the spill mat provide a slip-free surface for glassware and dishware, keeping the bar and kitchen counter top organized and pristine. Versatile in its functionality, this mat can be placed next to a coffee machine pot or sink, offering a practical solution for maintaining cleanliness in various settings. 23 5/8" L x 4" W

Black, Blue, Brown, Green, Gray, Red, Yellow

Barware, Kitchen, Party, Trade Show
Special effects printing. 23" W x 3 3/4" H on Center. Price includes 1 color, 1 side, 1 location

Production Time: 20 to 30 working days or 15 to 25 working days for rush service

Packaging: 1 pieces per poly bag; 50 units/ctn; 41 lbs./ctn

Shipping Point: China

Quantity Your Price (each)
100 $9.19 $8.50 Save $0.69
300 $8.45 $7.80 Save $0.65
500 $8.02 $7.42 Save $0.60
1,000 $4.42 $4.10 Save $0.32
3,000 $4.33 $4.00 Save $0.33
Save
Quantity: 100 300 500 1,000 3,000
Reg. Price (each): $9.19 $8.45 $8.02 $4.42 $4.33
Your Price (each): $8.50 $7.80 $7.42 $4.10 $4.00
Your Savings: $0.69 $0.65 $0.60 $0.32 $0.33
Setup: $110.00; Additional Color/Location Running Charge: 100-$0.05, 300-$0.05, 500-$0.05, 1,000-$0.05, 3,000-$0.05. Additional charges may apply.


Black, Blue, Brown, Green, Gray, Red, Yellow

Barware, Kitchen, Party, Trade Show

Special effects printing. 23" W x 3 3/4" H on Center. Price includes 1 color, 1 side, 1 location

Production Time: 20 to 30 working days or 15 to 25 working days for rush service

Packaging: 1 pieces per poly bag; 50 units/ctn; 41 lbs./ctn

Shipping Point: China